Sunday, June 28, 2009

Spare bathroom remodel

It's been 2.5 years in the making, but it's finally done. We completely gutted it down to the concrete floors and studs, and then installed the 18x18 travertine tile on the floors, installed the new tub, fixtures and 8x8 travertine tiles in the tub, had a solid wood cabinet built, granite cut to fit, and new sink and fixtures for the sink, new toilet, paint, baseboards, crown moulding, pendant lights and curved shower curtain. Brian and I did 100% of the work, and I absolutely love how it turned out. The best part was that we did everything for under $2,000!




3 comments:

Possibly any woman said...

LOVE the bathroom. Love it! You did a great job. :)

Mom and Larry said...

Way to go, you did a beautiful job.Proud of you both. Mom and Larry

Rhonda said...

The bathroom is beautiful!