Sunday, June 28, 2009
Spare bathroom remodel
It's been 2.5 years in the making, but it's finally done. We completely gutted it down to the concrete floors and studs, and then installed the 18x18 travertine tile on the floors, installed the new tub, fixtures and 8x8 travertine tiles in the tub, had a solid wood cabinet built, granite cut to fit, and new sink and fixtures for the sink, new toilet, paint, baseboards, crown moulding, pendant lights and curved shower curtain. Brian and I did 100% of the work, and I absolutely love how it turned out. The best part was that we did everything for under $2,000!
Subscribe to:
Post Comments (Atom)
3 comments:
LOVE the bathroom. Love it! You did a great job. :)
Way to go, you did a beautiful job.Proud of you both. Mom and Larry
The bathroom is beautiful!
Post a Comment